Process Control Project – Control of an Industrial Furnace

Published: 2019/12/11 Number of words: 321

Abstract

The aim of the project was to devise a suitable control strategy for an industrial furnace; to maintain a steady outlet temperature for the crude stream Tout (at 560K) and oxygen concentration in the fuel gas Co2 (at 5%) under various conditions. The furnace is modelled in Paragon 5.4, in which all the simulations are done. The degrees of freedom analysis is first done to give insight into the process. Transfer function models relating to changes in Tout and Co2 to changes in flowrates of oil (Foil), gas (Fgas) and air (Fair) as well as flowrate and temperature of the crude supply (Fin and Tin) are then identified using a first order plus time delay (FOPTD) model. Using relative gain analysis (RGA), the best pairing is found to be Fgas controlling Tout and Fair controlling Co2. Keeping the Co2 loop open, the best Pband and integral time were found to be 3.0 and 1.4 respectively for the temperature loop, which exhibits the best compromise among small overshoot, short settling time and small sum of squared error. A similar approach is applied to the Co2 loop, for which 3.7 and 0.4 are adapted as optimum Pband and integral time. To reject disturbances and further reduce loop minimizations, detuning, decoupling and feedforward control schemes are implemented. The best strategy found is to detune Tout loop, decouple Co2 loop and feedforward Fin. Finally, the performance of the devised strategy is tested on set-point and disturbance changes set by supervisors. Results suggest that a second decoupler on Tout loop and a feedforward controller on Tin might be useful.

Cite this page

Choose cite format:
APA
MLA
Harvard
Vancouver
Chicago
ASA
IEEE
AMA
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Copy
Online Chat Messenger Email
+44 800 520 0055